jjosuephotography_FormosisArchitecture_B-Roll_WEB-19.jpg

Formosis Architecture Inc.

 

Formosis Architecture Inc.

With my time at Formosis, I learned the scrappy nature of a small firm. In a 9-10 person office, everybody takes-on all responsibilities to respond to the fast-shifting needs and priorities of the firm on a daily basis. Being ‘nimble’ was the in-house motto, and among the most valued traits across the Formosis team. I learned to befriend discomfort, seek solutions, and adapt my communication style & workflow to different audiences and forums.

Among the most rewarding experiences at Formosis was taking-on all co-op students.  My approachability, patience, and general affinity for teaching and mentorship served me well in this leadership role; providing them with the training and guidance necessary to gain the competence and confidence to contribute to the professional environment of an architectural office. This role gave me excellent exposure in managing the many tasks and responsibilities of a design team.



- Research -

 

MISSING MIDDLE: Single-Egress Modular Research

Residential - Single-Egress Modular - V.B.B.L. Bylaw Update Study
Modular | Wood Frame Construction
Project Manager: Adam Gruchala
Vancouver, BC
6 Storeys
Summer 2026


This research study was prompted by changes to the Vancouver Building Bylaw enacted in January 2026. Council enacted changes allowing space-efficient egress options for buildings up-to 6 stories. This research seeks to compound the affordability of these code changes with the efficiency of modular construction to bring meaningful progress to the conversation of Missing Middle Housing; a hot topic in Vancouver’s architecture & planning community.

Since this work is intended for the responsible densification of low-rise residential neighbourhoods, these housing prototypes need to be capable of adapting to many different contexts and neighbourhood characters. Exterior cladding can take-on the heavy lifting in this respect - adopting different materials and styles to suit their respective neighbourhood.

This investigation seeks to strike the balance between off-site prefabrication and prototype housing that is sensitive & context-specific.


Image exerpt taken from Draft VBBL document, 2024.


- Studying Two Site Conditions -

After initial rounds of exploring the viability of various zoning and site dimensions, two scenarios were chosen to capture the range of design constraints one might face on a typical Vancouver land parcel:

Site Dimensions: 66’ x 122’'
Zoning Type: RM (Commercial at-grade, residential above)
Egress Type: Single Exterior Egress Stair

Site Dimensions: 50’ x 122’'
Zoning Type: C-2 (Commercial at-grade, residential above)
Egress Type: Space-Efficient Scissor Stair


Boosting the Missing middle

One of the central topics in the conversation of housing density and the liveability of neighbourhoods in Vancouver’s urban fabric is the concept of Missing Middle Housing: A term used to describe the growing need for a range of small parcel buildings in residential areas with multiple units—compatible in scale and form with detached single-family homes to support a walkable neighbourhood. While bringing this new concept to reality has been difficult from both a zoning legislation and financial lens, our research explores how modular design, coupled-with reduced egress requirements could re-ignite the possibilities for bringing higher density to low-rise neighbourhoods in a responsible manner.


Leveraging Prefab: Templated Design meets Contextual Sensitivity through Cladding

Although the main focus of our research was programmatic viability, buildability and space-efficiency, these prototypes can be situated in multiple contexts. The same site dimensions and zoning conditions exist in many areas of vancouver with different neighbourhood characters and styles. Therefore it was important that potential clients could imagine this fairly prescribed layout and form in many different settings they might have in mind. A series of ‘Sketch Renderings’ were developed using a framework of Ai prompts and basic skeletons which allowed us to quickly test and have fun with the various cladding possibilities without derailing the design process.


PLANS | RM-4 & C-2 ZONING PROTOTYPES

 

ELEVATIONS | SKETCH RENDERINGS

 


 - Hospitality -

 
 

888 W 8th Avenue: Hotel Development.

Hotel + Bar/Lounge
Lead: Adam Gruchala
Vancouver, BC
16 Storeys
2024-2026


Originally slated to be a market rental development, this proposal seeks to support local healthcare as part of new district mandates to increase hotel stock in proximity to the Healthcare Hub located in Uptown/Cambie North (FUCA) as envisioned in the Broadway Plan.

It is quite common for people across BC living outside Vancouver to require specialized treatment found only in the city. The specific intent for the hotel is to offer mid-to-long-term stay hotel suites - targeting patients and their families undergoing long-term treatment. Limited hospital bed stock and increased patient counts have brought about further need for hotels to offset these strains on our healthcare system. A Bar/Lounge is proposed at the ground level for use by hotel patrons and the general public.

Other design challenges with this site include a steeply sloping site, with a front-to-rear yard elevation difference of ~16 feet, as well as limited frontages for parkade ramp access and high water table below-grade. The proposal opted to use a combination of car elevators and a stacked parking system to make the most of the limited below-grade space. This worked very well logistically with the hotel program, since a valet service of trained employees could create a seamless guest experience along 8th avenue, as well as coordinate and limit traffic in the rear lane.


The Hotel Context

Current predictions forecast a deficit in available hotel rooms in Vancouver for the expected demand as soon as 2026.

Supply & Demand: In recent years, the number of hotel rooms in Vancouver has seen a decline due to hotel closures, zoning restrictions, land economics, the COVID-19 Pandemic, conversions to residential uses, as well as competing with short-term rentals.More hotel development is needed to meet an influx of tourists and visitors seeking-out Vancouver as both a healthcare hub, as well as a city centre to host a number of cultural, athletic and other international events. Visiting Vancouver will become even more expensive, leaving people


Exterior views


MASSING DIAGRAMS

 

Finding Height

The proposal carries with it some unique constraints. Located to the north of Vancouver General Hospital, the site falls under the height restrictions set by the VGH Helicopter Flight Path for VGH.

Through persistent research and communications with City Planning, Vancouver Coastal Health and helicopter/heliport consultants, we deduced that the Helicopter flight path was based-on older helicopter technologies. Through workshops we discovered that new helicopter upgrades with more linear take-off trajectories offered better height restrictions, allowing for two more stories to be added to the hotel, bringing much needed viability to the proposal.


STREETSCAPE AND GATHERING SPACES


- Drawings -

PLANS

 

ELEVATIONS + SECTIONS

 


- Social Housing-

 
 

Morrison Park: Social Housing Development

Social Housing \ Daycare \ Commercial Retail
Lead: Adam Gruchala
Vancouver, BC
21 Storeys
2025-2026


This proposal seeks to provide a 21-storey mixed-use building in a Transit-Oriented Area consisting of 100% social housing and an integrated 74-space childcare facility. The Renfrew-Collingwood area is home to a handful of low-rise below-market housing options. Situated within 12-minute walking distance to a skytrain station, the proposal would be among the first social housing towers resulting from local Transit-Oriented Development policy that supports density in proximity to public transit.

Design challenges and learning opportunities for this proposal included constant design changes with fast turnover in order to keep-up with constantly shifting timelines and financial projections. Since social housing/daycare doesn’t usually ‘pencil-in’ financially, a number of strategies were tested and proposed throughout the design process with City of Vancouver Planning departments to make the proposal financially feasible. This entailed constantly fitting & testing for the viability of programs like below-grade Electric Vehicle charging hubs, a Cashier-less/Self-Checkout Grocery store, and even below-grade Data Centre. Although these optimistic uses were not part of the final submission, much was learned with respect to the spatial design limits, as well as the collaborative power of working with consultants and industry experts.


3D VIEWS


MASSING DIAGRAMs


Existing Building


- Drawings -

PLANS | program distribution

 

ELEVATIONS + SECTIONS


 

© Affiliated clients & Formosis Architecture Inc.®, all rights reserved. Images for personal employment application use only - not to be redistributed or reproduced. See Disclaimer in Professional Work tab (or below) for further details.